Tuesday, September 29, 2026

Long Building letters export without timing out

Large Building letters, such as one with 171 items, no longer fail with "Letter export timed out." The letter is now worded in parallel batches of up to 20 items, each checked so no item is lost or added, and a batch that drifts keeps its original wording.

Building letter export includes missing information and comments

The Building letterhead export now carries Missing Information items and general comments, not just corrections. Following the City's own letters, they share one numbered list with the corrections under the structural and non-structural sections.

Distinct defects no longer dropped from Building letters

A Building correction letter no longer silently drops an item just because its text says "see" another item. Duplicate items are now decided from the review itself, so a separate defect that references another correction stays in the letter.