Week of November 14–20, 2026

Screener

Clearer resubmittal rounds

A returned filing now shows who sent it back and when, with links to the marked-up PDFs. Each City ask breaks into its parts with a Pass or Fail mark and a button to open the sheet where it belongs. Typed correction letters are read too, and staff paperwork no longer starts a new round.

Plan Review

Redlined plan sets and Bluebeam clouds

Plan check can now export a redlined plan set PDF that clouds each corrections letter item on its sheet with a short note and code section. Export to Bluebeam writes the same items as editable clouds, and edits read back in. Drawings stay sharp when zoomed.

Week of November 7–13, 2026

Developers & MCP

Work a review from your AI assistant

Connect CrossBeam to the AI assistant you already use. City reviewers can open the plan sheets beside the chat, keep or cut each finding, and the corrections letter updates as they go. Builders can read their results, mark up sheets and get a redline PDF to send to their designer.

Plan Review

Clearer corrections letters

Each correction now reads as one short paragraph: the sheet, what's wrong, then the fix and the code section. When a reviewer rewords an item, the letter prints only the reviewer's words.

Week of October 31 – November 6, 2026

Plan Review

One corrections letter, everywhere

The Letter tab, the letterhead export and the AI assistant connector now show the same letter. Letters print one item per thing the applicant must do, leave out items that didn't apply, and export right away.

Plan Review

Letters from a checker's comment sheet

Plan checkers can drop a Bluebeam or spreadsheet comment export and get a finished corrections letter.

Week of October 24–30, 2026

Backcheck

Compare two plan sets in Backcheck

A new Plan changes tab shows what changed between two plan sets, by topic or by sheet, with before-and-after views that zoom and pan together. You can also compare two sets with no corrections letter at all.

Week of September 26 – October 2, 2026

Plan Review

Building letters keep every item

The Building letterhead export now carries missing information and general comments along with corrections. Long letters export without timing out, and separate items are no longer dropped.