What's new

Changelog

Every change that makes CrossBeam better for the cities and builders who use it, written up the night it ships.

Saturday, October 3, 2026

Repeat reviews skip needless plan re-downloads

A second review on an already-prepared workspace no longer re-downloads every plan sheet. A link setup bug created a looping folder that failed the asset check; links are now replaced in place, so back-to-back runs start sooner.

Thursday, October 1, 2026

Cancelled reviews stop within a minute

A review that is cancelled or marked failed now stops its work within about a minute, and a run that finishes anyway can no longer overwrite the failed or cancelled status with results. Projects and their results always agree on status.

Empty pre-check and corrections runs now fail

A pre-check or corrections analysis that produces no report now ends as failed and releases its hold, instead of completing with a blank result that looked clean. A report with zero findings still completes normally.