Use CrossBeam from Claude, ChatGPT or Copilot

How do I draw a permit set with Claude using the city's rules?

Where: Connect CrossBeam in Settings → AI Connectors, then ask Claude to install the permit-drawings skill

How do I draw a permit set with Claude using the city's rules?

Quick answer: With CrossBeam connected, ask Claude to install the permit-drawings skill, then describe the project: "Draw an 800 sq ft detached ADU at 123 Main St, Lancaster." Claude looks up the parcel, what the city wants on the sheets, and the rule values for each thing it draws, then checks every drawn dimension against those rules before it hands you the sheets.

Steps

  1. Connect CrossBeam to Claude. See Connect CrossBeam to Claude. The drawing kit runs best in Claude Code or Cowork, which can run its scripts; approve script runs when asked.
  2. Ask: "Install the CrossBeam permit-drawings skill." In Claude Code it installs into your skills folder. In Cowork or Claude on the web, Claude gives you a link to add it as a plugin.
  3. Describe the project with the address, city and permit type.
  4. Claude looks up the site facts (zoning, overlays, fire and flood zones), the city's submittal requirements, and the limits for each element it draws, such as setbacks, heights and egress windows.
  5. Claude draws the sheets and runs the kit's checks. A drawn value that breaks a rule fails the check, and Claude fixes it.
  6. When the set is done, you can run a CrossBeam PreCheck on it from your dashboard before you file.

Good to know

  • Nothing here spends review credits. A PreCheck on the finished set is a paid review in the app.
  • If CrossBeam has no rule for something, Claude says so. That means unknown, not unregulated: confirm it with the city.
  • A value nobody could confirm stays a placeholder on the sheet, never a guess.

Related

From an AI assistantfor Claude and other assistants connected to CrossBeam
  1. crossbeam_get_site_facts with address (or apn with the city in address).
  2. crossbeam_get_review_requirements with city and permit_type; then lane for the required-document text and packaging: true for file format and upload slots.
  3. crossbeam_rules with city, permit_type or scope, address, and elements (plain words, up to 12 per call). Pass known site facts in site. It can take a minute or more.
  4. Turn each rule's kit_checks ({ key, op, value, unit }) into the kit's project.json rules: value becomes check.limit, op and unit carry over, key is kept as kit_key, and check.value references the drawn value. The skill's references/project-rules.md has the full shape.
  5. Install the kit with crossbeam_get_skill and skill_id: "permit-drawings". Compare version with your saved copy first. A shell host runs archive.install (link expires at archive.expires_at); Cowork or claude.ai gets upload.url and upload.how for the owner; anything else pages files with cursor. Optional modules (energy, structural, 3D) install with module.

Watch for:

  • Print a limit on a sheet only when quote_has_values is true and confidence is high; otherwise read the cited section first.
  • misses are unknown, never unregulated. A bad permit_type returns the valid list; correct it or send scope.
  • "PARCEL NOT CONFIRMED" means only point facts: ask for the APN. Never fill in a neighbor's facts.
  • rules_rate_limited has no reset time: do not loop. Use crossbeam_ask for the key elements.
  • crossbeam_rules answers "what limit applies to what I'm drawing". "What does section R319.2 say" is crossbeam_ask.

Related

How do I draw a permit set with Claude using the city's rules? · CrossBeam Permits Help