What's new

Changelog

Every change that makes CrossBeam better for the cities and builders who use it, written up the night it ships.

Sunday, October 4, 2026

ImprovedPre-Check

No permit-type picker when uploading a corrections letter

Applicants who upload a corrections letter no longer pick a permit type, and "Not sure" no longer defaults to an ADU. The AI review reads the letter and plans, names the permit kind, and runs and prices the corrections read as that kind.

Wednesday, September 30, 2026

Design Review section only when Design Review applies

Laguna Beach Planning letters now include the Design Review Authority section only when the project actually needs Design Review approval, based on the worksheet's entitlement decisions. Ministerial ADU and SB 9 lot split letters no longer carry it.

Tuesday, September 29, 2026

Laguna Planning letters keep their Missing Information section

Laguna Beach Planning letters now list missing submittals in a dedicated Missing Information section built from the review's findings. Before, the section was improvised and dropped from some letters.

Long Building letters export without timing out

Large Building letters, such as one with 171 items, no longer fail with "Letter export timed out." The letter is now worded in parallel batches of up to 20 items, each checked so no item is lost or added, and a batch that drifts keeps its original wording.

Building letter export includes missing information and comments

The Building letterhead export now carries Missing Information items and general comments, not just corrections. Following the City's own letters, they share one numbered list with the corrections under the structural and non-structural sections.

Distinct defects no longer dropped from Building letters

A Building correction letter no longer silently drops an item just because its text says "see" another item. Duplicate items are now decided from the review itself, so a separate defect that references another correction stays in the letter.

Friday, September 25, 2026

Every page of every upload reaches the review

A plan set uploaded under a document label such as a report no longer loses all but its first page. Each page now gets a thumbnail and is judged as drawing or supporting document, so letter-size plan sets land in the sheet index and get reviewed.

Laguna Beach reroof filings ask for Planning approval first

When the City record shows no Zone Clearance on file, Laguna Beach residential and commercial reroof screenings now list Planning approval as a missing item in the applicant email, instead of leaving it as a staff-only note that never reached the letter.