What's new

Changelog

Every change that makes CrossBeam better for the cities and builders who use it, written up the night it ships.

Thursday, October 8, 2026

ImprovedScreener

Marked-application download shows live progress

In the Planning screener's Applicant Email tab, the marked-application button now shows a spinner with its current step and a seconds counter ("Filling the City form... 14s"). A failure turns the button red with the reason until the next try.

Applicant email keeps item numbers in order

When staff reword a screener email item so it spans two lines, the next item keeps its number instead of restarting at "1.". Continuation lines now stay part of the item above them when edits are merged into a hand-edited email.

Tuesday, October 6, 2026

ImprovedPre-Check

PreCheck queue shows submit time and applicant email

Each row on the staff PreCheck tab now shows when its latest round was submitted in Pacific time ("Submitted Oct 5, 2:14 PM", or "Started" for an unfinished upload) and the applicant's email on its own line. Search matches the email too.

Sunday, October 4, 2026

ImprovedPre-Check

PreCheck re-checks grade only the requested fixes

A round 2 PreCheck grades only the items the applicant was told to fix: fixed, partly fixed, still open, or not in this upload. The counts are computed once, so the email, FastPass and results card agree. Re-dropping the same address offers "Re-check my fixed plans".

Brief results open without a flash of other tabs

Opening a brief from the results email no longer shows the default PreCheck tabs and counts for about two seconds before switching. The loading skeleton holds until the brief's tabs are ready, and the brief draws once.

Saturday, October 3, 2026

ImprovedPre-Check

City staff see PreCheck corrections runs

Corrections-letter runs now appear in the City's PreCheck queue, staff summary and weekly digest, with a Corrections pill and the round at that address. Applicants are told each read uses a free round, and the results email points them to the open questions.

ImprovedPre-Check

Redesigned PreCheck results and re-check emails

The round 1 email now opens with the brief's summary, lists what already works, and shows the steps in work order, with no red to-do counter. The re-check email leads with the FastPass result: the certificate and code if issued, or how many items remain.

No false slow-run email after a review is re-finished

Applicants no longer get a "Your PreCheck is taking longer than usual" email when only the final step of a finished review is re-run. The stuck-run check now looks at the newest run, including re-finishes, and skips them.

Friday, October 2, 2026

ImprovedPre-Check

One consistent PreCheck time estimate

Every applicant screen and email now says results take 30 to 90 minutes, including the intake page, receipt, live status ticker, FAQ and receipt email. The range comes from completed reviews on real plan sets, which took about 35 to 70 minutes.

ImprovedPre-Check

Focused PreCheck accounts and slow-run notices

Applicants with only city-paid PreChecks now see just Projects and their city's Ask AI assistant, without Job Sites or Drive. If a run is still going at 90 minutes, the applicant gets one email saying results are taking longer than usual and will arrive by email.

ImprovedPre-Check

PreCheck email link opens a live receipt

The link in the PreCheck receipt email now opens the same receipt card applicants saw after submitting, with live stages (Extract, Research, Review, PreCheck Report), a progress bar and elapsed time. City artwork on the receipt now crossfades slowly instead of popping.

Thursday, October 1, 2026

Clearer PreCheck results page and emails

City-paid PreCheck applicants no longer see the builder welcome tour, and a visitor signed in to the wrong account gets a plain explanation instead of a database error. Clear-cut corrections use a neutral bullet instead of a green check, the stats pill fits on phones, and failed emails are no longer dropped silently.

ImprovedPre-Check

Failed PreCheck runs no longer email applicants

When a city-program PreCheck run fails, only CrossBeam support is alerted and reruns it; the applicant no longer receives a "needs another try" email. Runs that produced no output are flagged in the alert so they are rerun first.

Buy another PreCheck round after the free ones

After an address uses its city-paid PreCheck rounds, the applicant can upload the next version and pay by card in the resubmit dialog; payment grants the credits and starts the review. Emails for that round drop the city-sponsored wording.

Resend link opens the review that is running

When an applicant submits twice at the same address while the first review is still running, the 'send my link again' email now opens the active review instead of the second submission that was refused.

ImprovedPre-Check

Applicants now see the PreCheck name and new terms

Every applicant-facing email, results page, certificate PDF and terms page now uses the PreCheck name, and the terms move to a new version that applicants accept once on their next submittal.

PreCheck refuses addresses outside city limits

The intake now checks a geocoded address against the city's incorporated boundary before anything is created. An address in a neighboring city is refused right away, naming that city, and the applicant gets an email pointing to a regular paid pre-check instead.

ImprovedPre-Check

Expired PreCheck sign-in links lead to a fresh link

An applicant who opens an expired or already-used emailed sign-in link now lands on their city's PreCheck intake page with the resend form open, instead of a password login they never set up. If the browser is already signed in, they go straight to their results.

Wednesday, September 30, 2026

ImprovedScreener

One fail per City ask on resubmittals

Resubmittal screenings now check only whether each City ask was delivered, across every current file, with one round summary. A delivered item with a defect, such as a missing signature, resolves its ask and shows as a staff note rather than a new applicant fail.

Friday, September 25, 2026

Laguna Beach reroof filings ask for Planning approval first

When the City record shows no Zone Clearance on file, Laguna Beach residential and commercial reroof screenings now list Planning approval as a missing item in the applicant email, instead of leaving it as a staff-only note that never reached the letter.