What changed in CrossBeam
Week of October 10–16, 2026
Fees tab handles separate permits and trades
When the City files part of the work under its own permit, such as demolition or grading, the Fees tab adds a subtotal for it. Trade fees are asked about only when the plans show that work, and trade counts come from the online application.
Clearer resubmittals and applicant emails
On resubmittals, each row that answers a City ask opens the reviewer's own words from the last round. Applicant emails give the planner's email address, describe Planning items in plain words, and send a single clear item when the property is outside the city.
Pre-Check briefs link to the City's forms
Every Pre-Check brief and results email now ends with an Apply for your permit section linking the City's own forms. Smaller homes are asked for the specific mechanical, electrical and plumbing items missing, not whole extra sheets.
Short answers with City forms linked
A resident's first answer is now a short plan: the bottom line, numbered steps with each City form linked, and one question. In Laguna Beach, answers lead with the likely approval route and cover trees, views, historic homes and design review.
Counties, not just cities
For an address outside every city in a covered county, the assistant now answers from the county's own rules. The website now speaks to cities and counties alike.
Laguna Beach electronic submittals
Laguna Beach building checks no longer ask for paper sets, so a single electronic submittal isn't flagged as short. The Incomplete Tasks tab stays up even when one of its task lists can't load.
Planning letters signed by you
Exported Planning letters now carry the signature of the person exporting instead of a placeholder. A planner's Incomplete Tasks tab merges coordinator tasks with item reviews, newest first.
Flood checks catch lots touching a flood zone
Plan review now flags flood requirements when any part of the lot touches a flood hazard area, not only its center. In Buena Park, the City Engineer elevation permit is asked for only on lots in a flood zone.
More accurate residential code values
Residential addition reviews now use current 2025 code values for joists, headers, rafters, bracing and footings, and an incorrect hold-down rule was removed from house, ADU and addition reviews.
Laguna Beach plugin and drafting kit for AI assistants
The public Laguna Beach plugin now carries the counter rules applied at intake and a before-you-file check, without individual case records. The drafting kit can draw fixtures, sections, schedules and 3D views.
Plus 19 smaller fixes and improvements.