What's new
What changed in CrossBeam
The improvements city staff, builders and applicants will notice, published every Friday.
Week of November 14–20, 2026
Redlined plan sets and Bluebeam clouds
Plan check can now export a redlined plan set PDF that clouds each corrections letter item on its sheet with a short note and code section. Export to Bluebeam writes the same items as editable clouds, and edits read back in. Drawings stay sharp when zoomed.
Week of November 7–13, 2026
Work a review from your AI assistant
Connect CrossBeam to the AI assistant you already use. City reviewers can open the plan sheets beside the chat, keep or cut each finding, and the corrections letter updates as they go. Builders can read their results, mark up sheets and get a redline PDF to send to their designer.
Clearer corrections letters
Each correction now reads as one short paragraph: the sheet, what's wrong, then the fix and the code section. When a reviewer rewords an item, the letter prints only the reviewer's words.
Files open only through checked links
Exported letters, marked-up plans and other files now open only through links that check who you are.
Week of October 31 – November 6, 2026
One corrections letter, everywhere
The Letter tab, the letterhead export and the AI assistant connector now show the same letter. Letters print one item per thing the applicant must do, leave out items that didn't apply, and export right away.
Letters from a checker's comment sheet
Plan checkers can drop a Bluebeam or spreadsheet comment export and get a finished corrections letter.
Week of October 24–30, 2026
Compare two plan sets in Backcheck
A new Plan changes tab shows what changed between two plan sets, by topic or by sheet, with before-and-after views that zoom and pan together. You can also compare two sets with no corrections letter at all.
Backcheck overlay, redlines and cleaner letters
The overlay draws the first submittal in red and the second in green, each row shows the reviewer's own redline beside the revised sheet, and rows take one of two calls: Addressed or Goes in letter. Planning backcheck letters print on the Planning letterhead.
Clearer findings and letter items
Each conflict between two sheets becomes one letter item naming both values and both sheets. A finding that points to several places lists each spot, results open with one header card, and reviewers can step through findings from the keyboard.
Week of October 17–23, 2026
Fewer unneeded asks in Building review
Building review no longer asks for special inspections or structural observation on a garage that belongs to a house, and fixture clearances and shower size get their own checks. Laguna Beach Building letters no longer add a response deadline.
Planning letters: your signature and a clearer to-do box
The Planning letter tab shows your saved signature, matching your export. The box before you send lists only what staff can act on, tagged Decide, Look up or Double-check. Laguna Beach letters pick the response period from the letter date.
Week of October 10–16, 2026
Planning letters signed by you
Exported Planning letters now carry the signature of the person exporting instead of a placeholder. A planner's Incomplete Tasks tab merges coordinator tasks with item reviews, newest first.
Week of September 26 – October 2, 2026
Building letters keep every item
The Building letterhead export now carries missing information and general comments along with corrections. Long letters export without timing out, and separate items are no longer dropped.
Laguna Beach Planning reviews and letters
Laguna Beach Planning reviews finish sooner and apply the zoning rules more precisely. Letters include the Design Review section only when the project needs Design Review, and list missing submittals in their own section.