What's new

What changed in CrossBeam

The improvements city staff, builders and applicants will notice, published every Friday.

Week of November 14–20, 2026

Plan Review

Redlined plan sets and Bluebeam clouds

Plan check can now export a redlined plan set PDF that clouds each corrections letter item on its sheet with a short note and code section. Export to Bluebeam writes the same items as editable clouds, and edits read back in. Drawings stay sharp when zoomed.

City Coverage

New California cities and local code

Planning review now works in more California cities, including plan review worksheets with local amendments, planning fees and live zoning lookups. Chat can read and cite a city's own municipal code chapters, and old residential code numbers point to the current sections.

Week of November 7–13, 2026

Developers & MCP

Work a review from your AI assistant

Connect CrossBeam to the AI assistant you already use. City reviewers can open the plan sheets beside the chat, keep or cut each finding, and the corrections letter updates as they go. Builders can read their results, mark up sheets and get a redline PDF to send to their designer.

Plan Review

Clearer corrections letters

Each correction now reads as one short paragraph: the sheet, what's wrong, then the fix and the code section. When a reviewer rewords an item, the letter prints only the reviewer's words.

Plan Review

More markup tools

Reviewers can add arrows, boxes and text notes on sheets, and export them to Bluebeam as editable markups.

City Coverage

Laguna Beach checklists, Fire routing and hearings

Commercial and multifamily filings now screen against Laguna's own checklists, and Fire Department review is routed by the type of work. The screener also finds Planning approvals from the City's hearing records, so a filing approved at a public hearing no longer waits on a staff question.

Week of October 31 – November 6, 2026

Plan Review

Comment, cloud and measure right on the sheet

Reviewers can add findings on the sheet with Comment, Cloud and Measure tools, edit or delete saved markups, and clouds stay crisp at any zoom. A Two screens button opens the sheets in their own window.

Plan Review

A review brief at the top of every result

Building, Planning and builder reviews open with a headline, a scope sentence and key facts, plus one bar showing corrections, items to verify and passes.

Plan Review

One corrections letter, everywhere

The Letter tab, the letterhead export and the AI assistant connector now show the same letter. Letters print one item per thing the applicant must do, leave out items that didn't apply, and export right away.

Plan Review

Fewer unneeded corrections on houses and ADUs

Building review stops asking for work the code doesn't require, including fire items on smaller units, drainage asks on level lots and electrical diagrams on exempt work. Commercial reviews cite the commercial code.

Plan Review

Letters from a checker's comment sheet

Plan checkers can drop a Bluebeam or spreadsheet comment export and get a finished corrections letter.

Plan Review

Solar and battery plan sets reviewed

Rooftop solar and battery storage plan sets now get a full building review with their own checks.

Week of October 24–30, 2026

Backcheck

Backcheck overlay, redlines and cleaner letters

The overlay draws the first submittal in red and the second in green, each row shows the reviewer's own redline beside the revised sheet, and rows take one of two calls: Addressed or Goes in letter. Planning backcheck letters print on the Planning letterhead.

Plan Review

Clearer findings and letter items

Each conflict between two sheets becomes one letter item naming both values and both sheets. A finding that points to several places lists each spot, results open with one header card, and reviewers can step through findings from the keyboard.

Platform

Reviews recover on their own

An interrupted review now picks up where it left off or ends cleanly with Retry and a refund. Results emails are retried instead of lost, and plan sheets render several times faster.

Week of October 17–23, 2026

Plan Review

Evidence boxes mark every match

Searching a sheet now boxes every place the text appears, so the reviewer picks the right one, and each pin shows the text inside its box.

Plan Review

Fewer unneeded asks in Building review

Building review no longer asks for special inspections or structural observation on a garage that belongs to a house, and fixture clearances and shower size get their own checks. Laguna Beach Building letters no longer add a response deadline.

Planning Review

Planning letters: your signature and a clearer to-do box

The Planning letter tab shows your saved signature, matching your export. The box before you send lists only what staff can act on, tagged Decide, Look up or Double-check. Laguna Beach letters pick the response period from the letter date.

Week of October 10–16, 2026

Screener

Clearer resubmittals and applicant emails

On resubmittals, each row that answers a City ask opens the reviewer's own words from the last round. Applicant emails give the planner's email address, describe Planning items in plain words, and send a single clear item when the property is outside the city.

Permit Assistant

Short answers with City forms linked

A resident's first answer is now a short plan: the bottom line, numbered steps with each City form linked, and one question. In Laguna Beach, answers lead with the likely approval route and cover trees, views, historic homes and design review.

Planning Review

Planning letters signed by you

Exported Planning letters now carry the signature of the person exporting instead of a placeholder. A planner's Incomplete Tasks tab merges coordinator tasks with item reviews, newest first.

Plan Review

Flood checks catch lots touching a flood zone

Plan review now flags flood requirements when any part of the lot touches a flood hazard area, not only its center. In Buena Park, the City Engineer elevation permit is asked for only on lots in a flood zone.

Week of October 3–9, 2026

Planning Review

Laguna Beach applicants can self-check plan sets

Applicants can drop a plan set on a public page and get a draft Planning checklist in a minute or two, before they file.

Platform

Help center checked against the app

Every help page was checked against the current app and corrected, with new pages on Planning review, the screener and more.

Week of September 26 – October 2, 2026

Plan Review

Building letters keep every item

The Building letterhead export now carries missing information and general comments along with corrections. Long letters export without timing out, and separate items are no longer dropped.

Plan Review

Findings point to the calc page they cite

A finding now shows its evidence on the structural calc or report page it cites, boxed around the exact words without covering them.

Plan Review

Tenant improvement and multi-unit sets get their own review

When a plan set turns out to be a commercial or restaurant tenant improvement or a multi-unit building, it now gets the review built for that permit type.

Planning Review

Laguna Beach Planning reviews and letters

Laguna Beach Planning reviews finish sooner and apply the zoning rules more precisely. Letters include the Design Review section only when the project needs Design Review, and list missing submittals in their own section.