What's new
What changed in CrossBeam
The improvements city staff, builders and applicants will notice, published every Friday.
Week of November 14–20, 2026
Planning quick check at the counter
Laguna Beach planners now decide quick checks right in the screener, with a short brief, page chips and a suggested outcome. Decisions update the Building screen and the applicant email, can be undone, and show who decided. Waiting quick checks stand out on the Planning board and open on the Planning tab.
Redlined plan sets and Bluebeam clouds
Plan check can now export a redlined plan set PDF that clouds each corrections letter item on its sheet with a short note and code section. Export to Bluebeam writes the same items as editable clouds, and edits read back in. Drawings stay sharp when zoomed.
New California cities and local code
Planning review now works in more California cities, including plan review worksheets with local amendments, planning fees and live zoning lookups. Chat can read and cite a city's own municipal code chapters, and old residential code numbers point to the current sections.
Week of November 7–13, 2026
Work a review from your AI assistant
Connect CrossBeam to the AI assistant you already use. City reviewers can open the plan sheets beside the chat, keep or cut each finding, and the corrections letter updates as they go. Builders can read their results, mark up sheets and get a redline PDF to send to their designer.
Two screens for intake
The screener can now put the plan sheets, aerial and photos on a second monitor while the checklist fills the first. Decisions stay in sync across both windows.
Fewer filings held up for later-stage items
Items the City normally checks during plan check or before issuance now show as "Noted, not blocking" instead of failing the filing at the counter. Staff can still ask the applicant for one right away.
Clearer corrections letters
Each correction now reads as one short paragraph: the sheet, what's wrong, then the fix and the code section. When a reviewer rewords an item, the letter prints only the reviewer's words.
More markup tools
Reviewers can add arrows, boxes and text notes on sheets, and export them to Bluebeam as editable markups.
Laguna Beach checklists, Fire routing and hearings
Commercial and multifamily filings now screen against Laguna's own checklists, and Fire Department review is routed by the type of work. The screener also finds Planning approvals from the City's hearing records, so a filing approved at a public hearing no longer waits on a staff question.
Files open only through checked links
Exported letters, marked-up plans and other files now open only through links that check who you are.
Week of October 31 – November 6, 2026
Comment, cloud and measure right on the sheet
Reviewers can add findings on the sheet with Comment, Cloud and Measure tools, edit or delete saved markups, and clouds stay crisp at any zoom. A Two screens button opens the sheets in their own window.
A review brief at the top of every result
Building, Planning and builder reviews open with a headline, a scope sentence and key facts, plus one bar showing corrections, items to verify and passes.
One corrections letter, everywhere
The Letter tab, the letterhead export and the AI assistant connector now show the same letter. Letters print one item per thing the applicant must do, leave out items that didn't apply, and export right away.
Fewer unneeded corrections on houses and ADUs
Building review stops asking for work the code doesn't require, including fire items on smaller units, drainage asks on level lots and electrical diagrams on exempt work. Commercial reviews cite the commercial code.
Letters from a checker's comment sheet
Plan checkers can drop a Bluebeam or spreadsheet comment export and get a finished corrections letter.
Solar and battery plan sets reviewed
Rooftop solar and battery storage plan sets now get a full building review with their own checks.
FastPass badge and certificate emails
A FastPass earned badge now shows on the project page and staff views, late certificates get their own email, and FastPass counts only what a plan set can fix. Re-check reminders carry the City's branding.
Week of October 24–30, 2026
Reminders to re-check revised plans
After round 1, applicants get short reminders on day 7, 14 and 28, and the results email has a Re-check your revised plans button. Designers can upload a revised set from a short link, with no account needed.
Compare two plan sets in Backcheck
A new Plan changes tab shows what changed between two plan sets, by topic or by sheet, with before-and-after views that zoom and pan together. You can also compare two sets with no corrections letter at all.
Backcheck overlay, redlines and cleaner letters
The overlay draws the first submittal in red and the second in green, each row shows the reviewer's own redline beside the revised sheet, and rows take one of two calls: Addressed or Goes in letter. Planning backcheck letters print on the Planning letterhead.
Resubmittal screens show only what the City asked
A resubmittal screen now shows what the project is, a colored verdict and only what the City asked for. Minor leftover items are left for plan check instead of failing the screen.
Clearer findings and letter items
Each conflict between two sheets becomes one letter item naming both values and both sheets. A finding that points to several places lists each spot, results open with one header card, and reviewers can step through findings from the keyboard.
Reviews recover on their own
An interrupted review now picks up where it left off or ends cleanly with Retry and a refund. Results emails are retried instead of lost, and plan sheets render several times faster.
Week of October 17–23, 2026
Evidence boxes mark every match
Searching a sheet now boxes every place the text appears, so the reviewer picks the right one, and each pin shows the text inside its box.
Fewer unneeded asks in Building review
Building review no longer asks for special inspections or structural observation on a garage that belongs to a house, and fixture clearances and shower size get their own checks. Laguna Beach Building letters no longer add a response deadline.
Planning letters: your signature and a clearer to-do box
The Planning letter tab shows your saved signature, matching your export. The box before you send lists only what staff can act on, tagged Decide, Look up or Double-check. Laguna Beach letters pick the response period from the letter date.
Week of October 10–16, 2026
Fees tab handles separate permits and trades
When the City files part of the work under its own permit, such as demolition or grading, the Fees tab adds a subtotal for it. Trade fees are asked about only when the plans show that work, and trade counts come from the online application.
Clearer resubmittals and applicant emails
On resubmittals, each row that answers a City ask opens the reviewer's own words from the last round. Applicant emails give the planner's email address, describe Planning items in plain words, and send a single clear item when the property is outside the city.
Short answers with City forms linked
A resident's first answer is now a short plan: the bottom line, numbered steps with each City form linked, and one question. In Laguna Beach, answers lead with the likely approval route and cover trees, views, historic homes and design review.
Planning letters signed by you
Exported Planning letters now carry the signature of the person exporting instead of a placeholder. A planner's Incomplete Tasks tab merges coordinator tasks with item reviews, newest first.
Flood checks catch lots touching a flood zone
Plan review now flags flood requirements when any part of the lot touches a flood hazard area, not only its center. In Buena Park, the City Engineer elevation permit is asked for only on lots in a flood zone.
Week of October 3–9, 2026
Laguna Beach applicants can self-check plan sets
Applicants can drop a plan set on a public page and get a draft Planning checklist in a minute or two, before they file.
Help center checked against the app
Every help page was checked against the current app and corrected, with new pages on Planning review, the screener and more.
Week of September 26 – October 2, 2026
Building letters keep every item
The Building letterhead export now carries missing information and general comments along with corrections. Long letters export without timing out, and separate items are no longer dropped.
Findings point to the calc page they cite
A finding now shows its evidence on the structural calc or report page it cites, boxed around the exact words without covering them.
Tenant improvement and multi-unit sets get their own review
When a plan set turns out to be a commercial or restaurant tenant improvement or a multi-unit building, it now gets the review built for that permit type.
Laguna Beach Planning reviews and letters
Laguna Beach Planning reviews finish sooner and apply the zoning rules more precisely. Letters include the Design Review section only when the project needs Design Review, and list missing submittals in their own section.