The improvements city staff, builders and applicants will notice, published every Friday.

Week of November 14–20, 2026

Plan Review

Redlined plan sets and Bluebeam clouds

Plan check can now export a redlined plan set PDF that clouds each corrections letter item on its sheet with a short note and code section. Export to Bluebeam writes the same items as editable clouds, and edits read back in. Drawings stay sharp when zoomed.

Week of November 7–13, 2026

Plan Review

Clearer corrections letters

Each correction now reads as one short paragraph: the sheet, what's wrong, then the fix and the code section. When a reviewer rewords an item, the letter prints only the reviewer's words.

Plan Review

More markup tools

Reviewers can add arrows, boxes and text notes on sheets, and export them to Bluebeam as editable markups.

Week of October 31 – November 6, 2026

Plan Review

Comment, cloud and measure right on the sheet

Reviewers can add findings on the sheet with Comment, Cloud and Measure tools, edit or delete saved markups, and clouds stay crisp at any zoom. A Two screens button opens the sheets in their own window.

Plan Review

A review brief at the top of every result

Building, Planning and builder reviews open with a headline, a scope sentence and key facts, plus one bar showing corrections, items to verify and passes.

Plan Review

One corrections letter, everywhere

The Letter tab, the letterhead export and the AI assistant connector now show the same letter. Letters print one item per thing the applicant must do, leave out items that didn't apply, and export right away.

Plan Review

Fewer unneeded corrections on houses and ADUs

Building review stops asking for work the code doesn't require, including fire items on smaller units, drainage asks on level lots and electrical diagrams on exempt work. Commercial reviews cite the commercial code.

Plan Review

Letters from a checker's comment sheet

Plan checkers can drop a Bluebeam or spreadsheet comment export and get a finished corrections letter.

Plan Review

Solar and battery plan sets reviewed

Rooftop solar and battery storage plan sets now get a full building review with their own checks.

Week of October 24–30, 2026

Plan Review

Clearer findings and letter items

Each conflict between two sheets becomes one letter item naming both values and both sheets. A finding that points to several places lists each spot, results open with one header card, and reviewers can step through findings from the keyboard.

Week of October 17–23, 2026

Plan Review

Evidence boxes mark every match

Searching a sheet now boxes every place the text appears, so the reviewer picks the right one, and each pin shows the text inside its box.

Plan Review

Fewer unneeded asks in Building review

Building review no longer asks for special inspections or structural observation on a garage that belongs to a house, and fixture clearances and shower size get their own checks. Laguna Beach Building letters no longer add a response deadline.

Week of October 10–16, 2026

Plan Review

Flood checks catch lots touching a flood zone

Plan review now flags flood requirements when any part of the lot touches a flood hazard area, not only its center. In Buena Park, the City Engineer elevation permit is asked for only on lots in a flood zone.

Week of September 26 – October 2, 2026

Plan Review

Building letters keep every item

The Building letterhead export now carries missing information and general comments along with corrections. Long letters export without timing out, and separate items are no longer dropped.

Plan Review

Findings point to the calc page they cite

A finding now shows its evidence on the structural calc or report page it cites, boxed around the exact words without covering them.

Plan Review

Tenant improvement and multi-unit sets get their own review

When a plan set turns out to be a commercial or restaurant tenant improvement or a multi-unit building, it now gets the review built for that permit type.